• Home
  • Topics
    • Industry and air
    • Waste and TFS
    • Water and land
    • Nature protection
    • Cross-cutting tools and approaches
  • Tools
    • Permitting
    • Inspections
    • Doing the right things
    • Better regulation
    • IMPEL Review Initiative
    • PREVENT
  • Projects
    • IMPEL projects
    • IMPEL-ESIX
    • LIFE SWEAP
    • WasteForce
    • SPIDER WEB
  • News
    • Latest news
    • Press releases
  • Publications
    • Outreach material
    • IMPEL Documents
    • General Assembly Meetings
    • Conference reports
    • EU Documents
  • Events
    • Internal meetings
      • General assembly
      • Board meetings
      • Expert team meetings
    • Project meetings
    • Conferences
  • About IMPEL
    • Strategy
    • Organisation
      • Board
      • Secretariat
    • Members and observers
    • Becoming a member
    • Contact
  • 
  • 
  • 

IMPEL

European Union Network for the Implementation and Enforcement of Environmental Law

You are here: Home / Doing the right things / Part 2 Permitting / Permitting cycle

Permitting cycle

 

Permitting cycle in brief

The structure can best be explained by first focussing on the Strategic cycle. The strategic cycle is for the managers.

Read more

The first step here is the Context. In the Context we identify and describe the information that is needed to set the policy and the right priorities (step 2) and define our strategies (step 3). Based on these 3 steps we can prepare a well-balanced workload plan for the permit writer.

The operational cycle is based on Plan Do Check Act Cycle (PDCA). First step is preparing a plan for the workload of the permit writer (see strategic cycle above). Based on this plan we make sure all conditions are met to execute this work (Permitting Framework). Next step is the execution of this work (Permitting procedure, see next paragraph). Last step is the monitoring. Here we check if targets in the plan are met and if we need to make changes in the Planning step.

In the Permitting procedure the actual permitting takes place. Although the steps in this part are presented linear (with a clear beginning and an end) in most cases (especially with the IED) when the permit is granted there will be a moment in time the permit needs to be reviewed and possibly revised.

The target groups we address are:

  • Strategic cycle: managers
  • Operational cycle: permit writers
  • Permitting procedure: Permit writers and inspectors

It’s good practise that a permit writer and the inspector understands what is happening in the strategic part.

Table of contents

  • Introduction
  • Part 1 Legislation
    • Industrial Emissions Directive 2010/75/EU
  • Part 2 Permitting
    • Permitting cycle
    • Strategic (permitting) cycle
      • Step 1A Context
      • Step 1B Priorities
      • Step 1C Strategy
      • Step 1D Planning
    • Operational (permitting) cycle
      • Step 1D planning
      • Step 2 Permitting framework
      • Step 3 Permitting procedure
        • Step 3A Application
        • Step 3B Decision making
        • Step 3C Acces to justice
      • Step 4 Monitoring
  • Part 3 Inspection
    • Inspection cycle
    • Strategic (inspection) cycle
      • Step 1A Context
      • Step 1B Priorities
      • Step 1C Objectives and strategies
      • Step 1D Planning
    • Operational (inspection) cycle
      • Step 1D Planning
      • Step 2 Inspection framework
      • Step 3 Inspection, Compliance Assessment and Enforcement
        • Step 3A Preparation
        • Step 3B Inspection
        • Step 3C Reporting
      • Step 4 Monitoring
  • Part 4 Evaluation and feedback
  • Factsheets

Regulatory cycle

Permitting cycle

Inspection cycle

Menu

  • Home
  • Topics
    • Industry and air
    • Waste and TFS
    • Water and land
    • Nature protection
    • Cross-cutting tools and approaches
  • Tools
    • Permitting
    • Inspections
    • Doing the right things
    • Better regulation
    • IMPEL Review Initiative
    • PREVENT
  • Projects
    • IMPEL projects
    • IMPEL-ESIX
    • LIFE SWEAP
    • WasteForce
    • SPIDER WEB
  • News
    • Latest news
    • Press releases
  • Publications
    • Outreach material
    • IMPEL Documents
    • General Assembly Meetings
    • Conference reports
    • EU Documents
  • Events
    • Internal meetings
      • General assembly
      • Board meetings
      • Expert team meetings
    • Project meetings
    • Conferences
  • About IMPEL
    • Strategy
    • Organisation
      • Board
      • Secretariat
    • Members and observers
    • Becoming a member
    • Contact
  • 
  • 
  • 

IMPEL

Chemin des deux maisons 73, box 3
1200, Brussels
Belgium
Phone: +44 (0)20 3289 7442
Email: info@impel.eu
Skype: impelsecretariat


Become a member

Membership of IMPEL is open to organisations or authorities working in the public sector who implement and enforce environmental legislation. Learn all about the benefits​ of being a member to our network.
Read More

Copyright © 2021 IMPEL · Data protection · Cookie policy · Webdesign: Alva Design